Project: | Full Annotation |
Query: | Signal:thus |
Date: | Sat Aug 09 12:25:44 2014 |
Number of hits: | 15 |
consequence-s | 5 | (33.33%) |
Consequence | 2 | (13.33%) |
result | 1 | (6.67%) |
comment | 1 | (6.67%) |
circumstance | 1 | (6.67%) |
evaluation-s | 1 | (6.67%) |
manner | 1 | (6.67%) |
background | 1 | (6.67%) |
interpretation-s | 1 | (6.67%) |
Cause-Result | 1 | (6.67%) |