Chapter Contents |
Previous |
Next |
Details of the OPTEX Procedure |
See "Design Efficiency Measures" for details on the efficiencies. The OPTEX procedure orders the designs first by the optimality criteria with which they were generated and then by optimality with respect to the other three preceding measures.
If you use the NOCODE option, the OPTEX procedure lists
If you specify one of the distance-based optimality criteria (CRITERION=U or CRITERION=S), then, instead of the preceding efficiencies, alternative measures of coverage and spread are listed. For U-optimality these measures are
In addition, the OPTEX procedure can create an output data set, as described in "OUTPUT Statement" and in "Output Data Sets" .
Chapter Contents |
Previous |
Next |
Top |
Copyright © 1999 by SAS Institute Inc., Cary, NC, USA. All rights reserved.