- Submit Request
- Campus Maps
- Directory of buildings
- Academic Quadrangle
- Alcan Aquatic Research Centre
- Applied Sciences Building
- Bee Research Building
- Beedie Field Concession
- Biology Trailer
- Blusson Hall
- Childcare Centre 1,2,3 &4 Office
- Convocation Mall
- Cornerstone
- Diamond Alumni Centre
- Discovery 1
- Discovery 2
- East Concourse Cafeteria
- East Theatre Annex
- Education Building
- Facilities Services
- Fire Pump Station
- Greenhouses 1,2,3 & 5
- Halpern Centre
- High Voltage Substation
- Leslie & Gordon Diamond Family Auditorium
- LDC Stadium
- Lorne Davies Complex
- Maggie Benston Centre
- Robert C. Brown Hall
- Saywell Hall
- Service Station
- Shrum Science Centre Biology
- Shrum Science Centre Chemistry
- Shrum Science Centre Kinesiology
- Shrum Science Centre Physics
- South East Classroom Block
- South Sciences Building
- Science Research Annex
- Strand Hall
- Student Union Building
- Technology & Science Complex 1
- Technology & Science Complex 2
- The Water Tower Building
- Trottier Observatory
- Transportation Centre
- Transit Loop Building
- W.A.C. Bennett Library
- Water Tower
- West Mall Centre
- West Parkade
- Winter Operations Building
- Barbara Rae House
- Dining Commons
- Hamilton Hall
- Mctaggart Cowan Hall
- Pauline Jewett House
- Shadbolt House
- Shell House Residence
- Townhouses (Total 9 buildings)
- Residence Phase1 East
- Residence Phase1 West
- University-Childcare-Centre
- Building & Infrastructure Records
- Key Plans
- Mapping Services
- Directory of buildings
- Projects & Initiatives
- Construction Projects
- Campus Master Plan
- REDI Initiatives
- Sustainable Initiatives
- Health and Safety Initiatives
- Contractors
- SFU Owner's Technical Requirements
- Services
- Real Estate
- About
- Contact Us
- Senior Management Team
- Administration and Real Estate Services
- Campus Planning & Development
- Maintenance and Operations
- Awards & Achievements
- News
- Meet SFU’s 2025 Staff Achievement Award recipients
- First phase of LDC renewals complete
- New robot cleaner rolls onto campus
- SFU unveils landmark new art museum at Burnaby campus
- New First Peoples’ Gathering House honours the past to shape the future at Simon Fraser University
- SFU reduces GHG emissions by 65% from 2007 levels
- Supportive and compassionate leadership: Sarah Mallen
- Construction underway on new student residence building and child care at SFU
- SFU's School of Sustainable Energy Engineering partners with Corix to enhance biomass plant efficiency
- Battling Winter: Meet SFU’s Snow Team and Their Surprising Names
- Renovated Diamond Alumni Centre now open for bookings
- SFU unveils plans for new student housing and child care centre
- SFU School of Medicine moves forward
- Adjustments to cleaning services – What you need to know
- Flushing Repair Costs Down the Drain
- New improvements to tackle snow at SFU
- Engineer Breaks Down Gender Barriers and SFU's Energy Emissions
- One Small Change Leads to Sustainable Reduction in Paper Usage by 90 Per Cent for Important SFU Workflow
- Burnaby Campus Biomass Facility Celebrates 2nd Year Anniversary After Smashing Renewable Energy Records
Renovation Projects
Lorne Davies Complex (LDC) Renewal Project
Status: In construction
Project Location: Lorne Davies Complex east building
Budget: $39M
Project Gross: 9000 square metres
Prime Consultant: Perkins & Will Architects
Expected Completion Date: Fall 2024
Extensive renovations will begin soon to provide a continued safe and healthy environment and to enhance student, athlete and community experience at the Lorne Davies Complex. The original campus building was constructed in 1965 with additions in 1973 (central gym), 2006 (west gym and fitness centre) and 2021 (stadium).
- The focus of the work will be within the 1965 original building, which will include seismic, mechanical, plumbing improvements
- New recreation change facilities to address, reallocate and moderately expand the change areas to address gender equity
- An upgraded pool deck to the existing pool
- Improved wayfinding and public access to the non-secure areas for students, visitors and the community
More information about Athletics and Recreation services impacted by this project and relocated services will be available on the project page.
Applied Sciences Building (ASB) Renovation Project
Status: Under construction
Project Location: Applied Sciences Building Levels 9000 and 10000
Budget: $25M
Project Gross: 10,000 square meters (108,000 square feet)
Prime Consultant: Grout McTavish Architects
Expected Completion Date: Spring 2024
The work includes:
- Addressing chronic water issues within the building envelope
- Adding 900 square meters of space to the north side of the 9000 and 10000 levels
- Creating shared innovation spaces to showcase work of students, and to foster collaboration within Faculty of Applied Sciences (FAS) students and community
- Providing a welcoming entrance that connects the east and west side of the SFU campus and supports future development of adjacent areas
- Consolidating administrative spaces to streamline operations
- Improving security measures at entry access points and respective functional rooms
- Installation of an energy-efficient building envelope that will reduce SFU’s carbon footprint, window replacement and a roof-cooling tower replacement.
More details check out the ASB Construction Project page. If you have a question, please contact www.sfu.ca/fas/asb-reno/contact.
Plaza Renewal - Phase 1 and 2
Status: Under Construction
Project Location: From Starbucks Plaza to AQ Plaza inclusive
Budget: $61M
Project Gross: 23,200 square meter (250,000 square feet)
Prime Consultant: Public Architecture
Expected Completion Date: Winter 2023
The public plazas and subsurface waterproofing is being replaced.
McTaggart-Cowan Residences
Status: Under Construction
Project Location: Between Residence Lane and Terry Fox Lane
Expected Completion Date: Fall 2024
Renewal features include:
- Exterior envelope renewal that aligns with Residence and Housing Revitalization Plan
- Supplementary mechanical ventilation improving air in each individual room
- Reduction in building energy usage, improvement of user comfort, reduction in greenhouse gas emissions, as well as maintain a consistent architectural standard across campus
- Resident room furniture replacement
- Updated flooring
Diamond Alumni Centre
Status: Under Construction
Project Location: Along University Drive East north of Robert C Brown building
Expected Completion Date: Winter 2023/2024
Improvements include:
- Exterior ramp, stairs, entry and walkway